Latest posts
-
Preparation for "WELCOME TO K2N" Entrance
On March 11, 2025, preparations for the "WELCOME TO K2N" entrance were carried out. The activity record photos can also be viewed.
-
Continued Weeding and Soil Cultivation Activities – Field No. (D5)
On March 11, 2025, weeding and soil cultivation activities were continued in Field No. (D5). The activity record photos can also be viewed.
-
Second Weeding and Soil Cultivation Activities on A-Line
On March 8, 2025, the second round of weeding and soil cultivation activities was carried out on A-Line. The activity record photos can also be viewed.
-
Lotus Pond and Natural Fern (Tepyar Plant) Coexistence Record
On March 8, 2025, the coexistence of the lotus pond and naturally grown Tepyar plants was documented. Tepyar is a tender and versatile edible plant, rich in natural nutrients and suitable for various culinary uses. It is also considered beneficial for individuals with diabetes as a natural dietary option. The activity record photos can also be viewed.
-
Arrival of Bamboo for Fencing and Trellis Construction
On March 7, 2025, the arrival of bamboo for fencing and trellis construction was recorded. The activity record photos can also be viewed.
-
Additional Arrival of Weeding and Soil Cultivation Materials
On March 5, 2025, the additional arrival of materials for weeding and soil cultivation was recorded. The activity record photos can also be viewed.
-
Arrival of Materials for Liquid Bio-Fertilizer Production
On March 5, 2025, the arrival of materials for liquid bio-fertilizer production was recorded. The activity record photos can also be viewed.
-
Advanced Bio-Fertilizer Powder Research and Experimentation – Field No. (C-4)
On March 5, 2025, an advanced bio-fertilizer powder research and experimentation trial was conducted in Field No. (C-4). The activity record photos can also be viewed.
-
Continued Weeding and Soil Cultivation Activities
On March 3, 2025, weeding and soil cultivation activities were continued. The activity record photos can also be viewed.
-
Canal Water Blocking and Releasing Operations
On February 26, 2025, the canal water blocking operation was carried out, followed by the water release operation on March 3, 2025. The activity record photos can also be viewed.